Contractors that assume design risk contractually will require PI insurance as they are vicariously liable for the negligence of their third-party consultants. Those within the construction industry now need to consider carefully with their broker any likely exposure, be it future or historical, and must now be aware that taking out initial cover or renewing existing cover could take much longer than before as more due diligence is required. DOWNLOAD OUR INSURANCE CHECKLIST!