Floor tiles installed and grouted. New shower grate shown.

Floor tiles installed and grouted. New shower grate shown.

Inside you'll note the exposed Oregon ridge beam and collar ties and the Velux skylights.

Inside you'll note the exposed Oregon ridge beam and collar ties and the Velux skylights.

Privacy screen to be used for a hanging garden installed.

Privacy screen to be used for a hanging garden installed.

Decking completed and feature Redgum panelling to the sliding door cavity and privacy screen installed.

Decking completed and feature Redgum panelling to the sliding door cavity and privacy screen installed.

Reinforcement in place ready for concrete to the footings.

Reinforcement in place ready for concrete to the footings.

New wall and doors, new window and new flooring. This is the end result of where the double brick wall was removed forming a new study area and a walk in linen/storage.

This is the end result of where the double brick wall was removed forming a new study area and a walk in linen/storage.

Bathroom completed with new vanity, toilet and mirrored vanity cabinet

Bathroom completed with new vanity, toilet and mirrored vanity cabinet

Basically finished! More photos to come when the landscaping is done and the kitchen has been installed.

More photos to come when the landscaping is done and the kitchen has been installed.

Finished product showing the stairs installed, floors polished and painting completed. looks fantastic.

Finished product showing the stairs installed, floors polished and painting completed. looks fantastic.

Hand built stairs ready to be installed.

Hand built stairs ready to be installed.

Roof on, fascias and eaves installed, windows and doors installed and plastering underway and verandah framework built.

Roof on, fascias and eaves installed, windows and doors installed and plastering underway and verandah framework built.

Basic framework completed. Note the cathedral ceiling.

Note the cathedral ceiling.

Slab poured and termite treatment installed ready for some framing.

With over 35 years serving the Brisbane and surrounding suburbs, we are the Best Pest & Termite Inspection and Control Specialist.

Base brickwork completed, compaction of fill completed, sand and poly placed and reinforcement placed and formwork to the edge beam set.

Base brickwork completed, compaction of fill completed, sand and poly placed and reinforcement placed and formwork to the edge beam set.